Planning & Schedule

Nine stages,one gate, and aprogramme that holds.

Planning is a sequence of dependent decisions, not a folder of documents. Each stage has to be answered before the next opens, and the whole thing locks when it is signed off.

01The pipeline

Every stage knows what the last one decided.

Skipping is allowed. Skipping silently is not — a skipped stage records who decided and why.

01

Project setup

Client, district, areas, programme dates and the project manager. The district becomes the pricing context for everything downstream.

02

Statutory approvals

Land title, planning permission, utility NOCs. Sits before design, because it decides whether there is a project at all.

03

Design & engineering

The drawing register, with architects uploading through their own link and revisions superseding cleanly.

04

BOQ & cost planning

Zone-first measurement priced by rate analysis. This is the number the whole programme is built against.

05

Resource requirement

What the priced BOQ implies in material, labour and plant, consolidated across every line.

06

Tender

Out to contractors on an expiring link, with the scope frozen at the moment of invite.

07

WBS

Work packages generated from the priced lines, nested to any depth, each with an owner.

08

Resource planning

The engineers who monitor each activity and the vendors who supply it.

09

Detailed scheduling

Durations from quantity and output, dependencies with lag, calendars, and a computed critical path.

The gate

Ready to Build

Planning locks, the baseline is captured with who threw the switch and when, and rates freeze — so every variance afterwards is measured against a plan somebody actually signed.

02Detailed scheduling

The critical path is computed, not coloured in.

Durations come from quantity divided by the crew's output. Change one and the path moves.

Schedule · Critical path · 215 days
AugSepOctNovDecJan
1Substructure
100%
1.1Piling
100%
1.2Pile caps & plinth
100%
2Superstructure
48%
2.1Columns 1-6
100%
2.2Slabs 1-6
72%
2.3Masonry 1-4
35%
2.4Columns 7-12
0%
Critical path Activity SummaryFS · SS · FF · SF with lag

Four dependency types

FS, SS, FF and SF, each with lag — because a slab does not always wait for a whole floor to finish.

A working calendar

Six-day weeks, declared holidays and a monsoon window, so a date is a date somebody can actually work.

Baselines

Captured at lock. Variance is measured against them rather than against last week's optimism.

Bring a programme that slipped.

We will rebuild it from the priced BOQ and show you where the durations came from.